WASA Line Imploded – Nanga

By Sue-Ann Wayow THE 48-inch water transmission line that caused much distress to residents in need…

Water in Taps Today

WASA acting Chief Executive Officer Kelvin Romain explains that the ruptured transmission line should be repaired…

WASA Holds Press Conference at 10 am

AS delays continue in the repairs to a 48-inch diameter transmission pipeline, the Water and Sewerage…

Specialised Pipes for Landslips – Nanga

By Sue-Ann Wayow TO better assist in preserving infrastructure, the Water and Sewerage Authority (WASA) is…

WASA: We Fix Roads in 7 Days

By Sue-Ann Wayow ONCE the Water and Sewerage Authority (WASA) repairs leaks along the nation’s roadways,…

Mayaro Water Woes: Paray Proposes Fix

By Sue-Ann Wayow WHILE there is a long-term plan in place to address water issues in…

Bad Weather Affects Water Supply

By Sue-Ann Wayow CONSISTENT overnight rainfall has negatively affected some of the Water and Sewerage Authority…

WASA Fixes 5,000 Leaks

By Sue-Ann Wayow THE Water and Sewerage Authority (WASA) has fixed 5,000 leaks over the years…

FFOS: WASA Must Stop Relying on ‘Man-Made’ Water

  REGARDLESS of whether it is the dry or rainy season, now is the time to…

New Executive Team Appointed at WASA

  A NEW interim executive management team has been appointed to lead the Water and Sewerage…